Fabrication + Installation

FABRICATION

The Work in Progress project is designed to be fabricated in-house with Sheridan facilities and technical skills.

Its fabrication will draw on the strengths of each of our campuses:

Davis Campus (Brampton):

Centre for Advanced Manufacturing and Design Technologies and Skilled Trades Centre
Steel and aluminum welding and structural design

Trafalgar Campus (Oakville):

Faculty of Animation, Arts and Design, Furniture
CNC etching of Sheridan brand

Faculty of Animation, Arts and Design, Theatre
Shared research into projection mapping and its applications

Hazel McCallion Campus (Mississauga):
Faculty of Applied Science and Technology, Architectural Technology
Working drawings

INSTALLATION

Location:

Creativity Commons on the second floor of Hazel McCallion Campus B-Wing

Links the Institute for Creativity to the Creative Campus Gallery, completing the creative process: Support>Make>Present

Logistical considerations:

On-site staging area required. Portions of installation pre-made at other locations

Installed with student and technical support

Projectors attached to suspended ceiling mounts (standard Sheridan projector mounting method)

Projection will need to be calibrated to artwork

Projection mapping program created. Algorithmic scripts prepared with accompanying “how-to” manual

Lighting will need to be “zoned” for sculpture

Return to Work in Progress Main Page